Azad Kashmir Spectator

IconA source of political, social, education and recreational news and reports from Azad Jammu and Kashmir

Pages

Showing posts with label PPRA. Show all posts
Showing posts with label PPRA. Show all posts

Hydroelectric power: WAPDA alleges rules were flouted in award of contract



If the hydropower project on River Jhelum is constructed, it will generate 1,000 MW of electricity. PHOTO: FILE


MUZAFFARABAD:  Pakistan and China are trapped in a deadlock over the construction of the 1,100 megawatts (MW) Kohala Hydropower Project on the Jhelum River in Azad Jammu and Kashmir (AJK) due to Wapda’s intransigence.The contract was awarded to a Chinese construction company, China International Water and Electric Corporation (CWE).